Thread

  1. bug-report

    Eivind Kvedalen <eivindkv@ifi.uio.no> — 2000-10-16T19:53:21Z

    ============================================================================
                            POSTGRESQL BUG REPORT
    ============================================================================
    
    
    Your name		: Eivind Kvedalen
    Your email address	: eivindkv@ifi.uio.no
    
    
    System Configuration
    ---------------------
      Architecture (example: Intel Pentium)  	: Intel Pentium III
    
      Operating System (example: Linux 2.0.26 ELF) 	:
        Linux support 2.2.14 #9 SMP Thu Oct 12 12:10:07 CEST 2000 i686 unknown
    
    
      PostgreSQL version (example: PostgreSQL-7.0):   PostgreSQL-7.0.2
    
      Compiler used (example:  gcc 2.8.0)		: egcs-2.91.66
    
    
    Please enter a FULL description of your problem:
    ------------------------------------------------
    
    to_char gives incorrect day conversion of the date 2000/03/26.
    
    
    Please describe a way to repeat the problem.   Please try to provide a
    concise reproducible example, if at all possible: 
    ----------------------------------------------------------------------
    
    The SQL-code 
    
    create table test_table (
        date_col date
    );
    
    insert into test_table values ('2000/03/25');
    insert into test_table values ('2000/03/26');
    
    select date_col from test_table;
    select to_char(date_col, 'YYYY/MM/DD - WW') from test_table;
    
    drop table test_tab
    
    results in
    
    CREATE
    INSERT 2370569 1
    INSERT 2370570 1
      date_col
    ------------
     2000-03-25
     2000-03-26
    (2 rows)
    
         to_char
    -----------------
     2000/03/25 - 12
     2000/03/25 - 12
    (2 rows)
    
    which is incorrect. I have not detected any other dates which gives
    the same result.
    
    If you know how this problem might be fixed, list the solution below:
    ---------------------------------------------------------------------
    
    
    
    
    
    
  2. Re: bug-report

    Thomas Lockhart <lockhart@alumni.caltech.edu> — 2000-10-17T05:24:17Z

    > to_char gives incorrect day conversion of the date 2000/03/26.
    
    This is fixed in the current (development) sources.
    
                          - Thomas